Cloud migration from legacy to multi-cloud.
Move to AWS, Azure or Google Cloud without your customers noticing. We map your workloads in a two-week assessment, plan every cut-over with a rollback ready, migrate in waves and keep the bill in check afterwards.
Who it’s for, and what to expect.
For companies moving legacy applications off their own servers, and for teams already in the cloud whose bill or reliability needs work. From our base in Gurugram we plan and run migrations to AWS, Microsoft Azure and Google Cloud, including hybrid set-ups with on-premise data centres, for clients in India and abroad.
Every migration starts with a two-week assessment that maps your workloads and dependencies and ends with a plan and an estimate for each migration wave. We move in waves, with blue-green or canary cut-overs and a rollback ready for each one, so customers don’t notice. Afterwards we can hand over, or stay on for 24×7 operations, DevOps and cost control. Right-sizing, reserved capacity and clearing idle resources are usually the first savings we look at, and our cloud migration checklist covers every step.
What's included
Pick the parts you need, and add more once the first one is working.
Cloud Assessment
TCO models, workload classification and dependency mapping in two weeks.
Lift & Shift
Rehost or replatform — minimal code changes, maximum speed.
Refactor & Rearchitect
Microservices, event-driven, serverless — pick your destination.
Hybrid & Multi-cloud
Run where it makes sense. Burst when it does. Move when it doesn’t.
FinOps controls
Real-time spend dashboards, anomaly alerts, chargeback by team.
Day-2 Operations
24×7 NOC. Patching, capacity planning, DR drills.
How we work
Discover
A short paid discovery: goals, constraints, a written plan and estimate.
Design
Architecture, UX and a clickable prototype you can react to.
Build
Two-week sprints, with a demo at the end of each one.
Run
Launch, monitor and hand over — or we keep running it 24×7.
Engineering standards
What you can hold us to on every engagement.
Tech stack
AWS, Microsoft Azure, Google Cloud · Kubernetes, Istio, Argo CD · Terraform, Ansible, Vault · Nginx, Cloudflare · Redis
- A two-week assessmentWorkloads and dependencies mapped in two weeks, ending in a plan and an estimate for each migration wave.
- Waves with a rollback readyBlue-green or canary cut-overs, with the rollback planned before each wave starts.
- Infrastructure as codeEnvironments in Terraform and Ansible, secrets in Vault and Kubernetes run through GitOps, so nothing depends on a server nobody can rebuild.
- Cost under controlRight-sizing, reserved capacity and clearing idle resources come first; spend dashboards and anomaly alerts follow.
- Day-2 operations24×7 operations after go-live: patching, capacity planning and disaster-recovery drills.
Questions about cloud migration
AWS, Microsoft Azure and Google Cloud, plus hybrid set-ups with on-premise data centres.
We plan cut-overs with blue-green or canary releases so customers don't notice, with rollback planned before we start.
It depends on how many applications move and how much changes on the way. A two-week assessment maps your workloads and dependencies, and ends with a plan and an estimate for each migration wave.
The assessment takes two weeks. After that it depends on how many applications move and how much changes; the plan sets a date for each migration wave, and every wave has a rollback ready.
Usually. Right-sizing, reserved capacity and cleaning up idle resources are the first things we look at.
Yes. Pipelines, Kubernetes, infrastructure as code and monitoring are part of our DevOps & Cloud Automation service, and can run alongside a migration.
Guides on cloud migration
Let's talk about cloud migration.
Software, people or growth — a person replies within one working day.